Custom Homes, Additions & Renovations • Tampa Bay & Lakeland • (813) 363-6303
Design & Build Division

Home Additions

An addition is judged entirely by the join. Where the new roof meets the old one, and where the new foundation meets the existing, is what fails first.

Request Home Additions

Adding to an existing house is a different discipline from building new. The existing structure has already moved, settled and been modified, sometimes without a permit. The addition will move differently unless the foundation and roof are tied in deliberately.

That is why an addition starts with an assessment of what is actually there. Roof pitch and framing direction, wall construction, foundation type and the condition of what we are attaching to all determine how the new work has to be built.

Tying the roof in properly

The junction between a new roof and an old one is where additions leak. Pitch differences, framing direction and the age of the existing covering all matter, and a low-slope transition against a steeper existing roof needs proper flashing rather than a reliance on sealant. Where the existing roof is near the end of its life, replacing the affected section at the same time is usually cheaper than coming back to it.

Foundation continuity

A new foundation will settle differently from one that has been in place for decades, and the joint between them is where cracking appears. The new footing has to bear on suitable soil, and on Florida lots that often means accounting for the seasonal water table. Where the existing foundation is a slab, the new work has to be keyed into it so the two move together rather than independently.

Permits and what triggers them

Any addition that changes the building footprint is permitted work, and it usually triggers a review of the whole structure rather than just the new portion. Adding a bedroom can change the septic or sewer capacity calculation. Adding conditioned space changes the heating and cooling load. Both are reviewed at permit stage, and both are better established before the design is finalised.

When to call

  • You need another bedroom or a larger primary suite
  • You are adding a home office, studio or guest space
  • You need an in-law or multi-generational suite
  • You want more living or dining space without moving house
  • A previous addition was built without a permit and needs regularising
  • You are weighing an addition against moving

How the work is handled

  • Assessment of the existing structure, roof and foundation
  • Design and structural coordination for the new work
  • Permit application, including any capacity reviews triggered
  • Construction of the foundation, framing, roof and tie-in
  • Mechanical, insulation, finishes and final inspection

What affects the cost

We do not quote a number before seeing the property, because the same job on two similar houses can need different work. These are the factors that move the scope:

  • Size of the addition and whether it adds plumbing
  • Roof complexity and the condition of the existing covering
  • Foundation type and the depth required at the new footprint
  • Whether the existing structure needs remedial work
  • How much of the existing house has to be opened up
  • Permit fees and any capacity or engineering reviews

Frequently asked questions

Will an addition increase my property taxes?

Adding conditioned square footage is normally reported to the county property appraiser and can change the assessed value. That is a question for the appraiser rather than for us, but it is worth expecting rather than being surprised by.

Can I live in the house during the work?

For most additions, yes. The work is largely contained to the new area and the tie-in points. There will be periods when a wall is open or power is off in part of the house, and we tell you when those are coming.

Do I need a permit for a small addition?

Adding conditioned living space always requires a permit, regardless of size. Some unheated structures fall under different rules, and the requirement is set by your local jurisdiction. We confirm what applies before starting.

How do you handle the joint between old and new?

The new foundation is keyed into the existing one so the two move together, and the roof transition is flashed properly rather than sealed. Those two details are where additions fail, so they get designed rather than improvised on site.

Related services

Custom Home Building across Tampa Bay and Lakeland

On Florida slab-on-grade homes, the addition footing and the existing slab have to be tied together deliberately, or the joint between them opens up within a few seasons. We work throughout Tampa, Brandon, Riverview, Valrico, Plant City, Lutz, Land O' Lakes, Wesley Chapel, Odessa, Zephyrhills, Lakeland.

What we see most often in this region

  • Existing roofs near end of life where the tie-in section should be replaced
  • Slab-on-grade homes needing a keyed joint between old and new foundations
  • Unpermitted prior additions discovered during the assessment
  • Additions that push the household past the existing septic design capacity
Call (813) 363-6303 Email